The purpose of this project is to upgrade existing roadways, curb and gutter, sidewalks, utility services, and storm water systems in the Edgewood neighborhood. Armstrong Glen’s services include field surveying, engineering design, public involvement and utility coordination.
Over one mile of new sidewalk and 8,000 linear feet of new curb and gutter was installed to allow safe pedestrian access in this high traffic, high speed neighborhood.