CLIENT

CITY OF CHAROTTE

COST

$4,000,000 est.

SERVICES

STORM WATER DESIGN

LOCATION

CHARLOTTE, NC

STATUS

COMPLETE

 

The Hinsdale-Tinkerbell Storm Drainage Improvement Project is located in the Southpark area, about 8 miles due south of downtown Charlotte.  The study area is roughly bounded by Wamath Drive to the north, Sharon Road to the west, McMullen Creek to the east, and Quail Hollow Road to the south. The purpose of the project is to reduce flooding of streets and structures, and to address any channel capacity and erosion problems within the project area.

This current storm water project consists of a planning study which includes a hydrologic and hydraulic analysis of a storm drainage network within a fully-developed 258 acre urban watershed.

Estimated Construction Cost: $4,000,000.  Project Duration: September 2011 to present (currently in the design phase).

 

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text.