CLIENT

CHARLOTTE WATER

COST

$1,000,000 est.

SERVICES

SEWER DESIGN

LOCATION

CHARLOTTE, NC

STATUS

DESIGN PHASE

 

This current Charlotte Water (CLTW) project provides designs to eliminate four existing CLTW submersible sewage lift stations and to replace all four with gravity sewer outfalls. Two of the lift stations are near the Town of Matthews, and two are located several miles east of Charlotte. The outfall lengths for the four projects are as follows:

  • Bristol Farms Outfall – 3,500 FT
  • Win Hollow Outfall – 3,700 FT
  • Williams Station Outfall – 700 FT
  • Brandywine Outfall – 200 FT

All outfalls will consist of either 8-inch or 10-inch diameter PC 350 ductile iron pipe. Obstructions include many backyard fences, retaining walls, roadway fills and wetlands.  Sewer will be routed around wetland areas whenever possible.  Our services include planning, surveying, design, drawing preparation, easement mapping, geotechnical investigation, bid document preparation, and bidding. Estimated construction cost: $1,000,000.

 

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text.